How much are manual RUSLE calculations costing you?
Every time a QSD manually determines R, K, and LS factors and rebuilds a spreadsheet, that is billable time your firm is absorbing. See how much you could save by automating calculations and inspection scheduling.
RUSLE calculations
Manual R/K/LS factor lookup, sediment risk scoring, and rework when project dates or scope change.
Salary + benefits + overhead. Industry benchmark: $85 to $125/hr for a QSD.
Estimated annual savings
225 hrs recovered per year
RUSLE calculations
100 projects x 2.25 hrs saved each
$22.5k/yr
225 hrs
That is equivalent to
at 40 hrs/week
5.6 weeks
of QSD time/yr
Results are estimates for planning purposes only. Rapid RUSLE Pro is $99/mo or $990/yr.
Sound familiar? Here is what manual RUSLE typically looks like
Factor lookup
Manually determine R, K, and LS factors across EPA, SSURGO, and USGS data sources. Every project, every time.
Spreadsheet math
Assemble factors in a spreadsheet. Apply CGP thresholds manually. Format the output to paste into a SWPPP appendix. Hope nothing changed.
Rework when dates shift
Project timeline moves two weeks. R-factor changes. Risk classification might flip. Start over. Bill it to overhead or eat it.
With Rapid RUSLE: enter an address, get R/K/LS automatically.
Change a project date and click recalculate. Export a CGP-ready PDF in seconds. And let automated inspection scheduling handle rain-triggered notifications and inspector coordination so your PMs stop managing it by hand.