Skip to main content

How much are manual RUSLE calculations costing you?

Every time a QSD manually determines R, K, and LS factors and rebuilds a spreadsheet, that is billable time your firm is absorbing. See how much you could save by automating calculations and inspection scheduling.

RUSLE calculations

Manual R/K/LS factor lookup, sediment risk scoring, and rework when project dates or scope change.

100
10200
$100/hr
$/hr

Salary + benefits + overhead. Industry benchmark: $85 to $125/hr for a QSD.

Estimated annual savings

$22.5k

225 hrs recovered per year

RUSLE calculations

100 projects x 2.25 hrs saved each

$22.5k/yr

225 hrs

That is equivalent to

at 40 hrs/week

5.6 weeks

of QSD time/yr

Rapid RUSLE Pro is $99/mo. The math is not hard.

Start free - 2 projects includedBook a 15-min demo

Results are estimates for planning purposes only. Rapid RUSLE Pro is $99/mo or $990/yr.

Sound familiar? Here is what manual RUSLE typically looks like

01

Factor lookup

Manually determine R, K, and LS factors across EPA, SSURGO, and USGS data sources. Every project, every time.

02

Spreadsheet math

Assemble factors in a spreadsheet. Apply CGP thresholds manually. Format the output to paste into a SWPPP appendix. Hope nothing changed.

03

Rework when dates shift

Project timeline moves two weeks. R-factor changes. Risk classification might flip. Start over. Bill it to overhead or eat it.

With Rapid RUSLE: enter an address, get R/K/LS automatically.

Change a project date and click recalculate. Export a CGP-ready PDF in seconds. And let automated inspection scheduling handle rain-triggered notifications and inspector coordination so your PMs stop managing it by hand.